Interconnection
Readiness Score

Cluster study queues drop projects that cannot show site control and commercial readiness, and withdrawal penalties follow. Enter a project's readiness checklist below and this page returns an integer score from a frozen weight vector, a tier, and the exact list of failed criteria. The same checklist always produces the same score and the same hash, so a developer and a reviewer can compare the same number.

Data: FERC Order No. 2023 (interconnection queue reform) · editorial weight vector v1

Readiness Checklist STEP 1
Worth 30 of 100 points
Worth 20 of 100 points
Scales linearly up to 30 of 100 points
1 or greater earns the deposit-adequacy points (10 of 100)
Worth 10 of 100 points
--
--
tier is an output field and conditional UI, not an approval to enter a queue.
Readiness Score
--
Out of 100, frozen weight vector v1
Tier
--
Ready ≥80, conditional ≥50, else deficient
Withdrawal Risk
--
Site control or deposit missing
Detail
Site control documented--
Study deposit posted--
Commercial readiness--
Study deposit multiple--
Withdrawal penalty acknowledged--
Failed criteria--
Weight vector version--